Previous Page  178 / 237 Next Page
Information
Show Menu
Previous Page 178 / 237 Next Page
Page Background

24

DIAMOND Precast Concrete Ltd.| 7520 Conrad St | Burnaby, BC V5A 2H7

Tel: 604.415.5181 | Fax: 604.415.5185 |

www.DiamondPrecast.com

Section: 11

Date: 12/03/2015

Edition 1, Revision: 0

Page: 2 of 2

F.

The QCM shall inspect non-conformities after completion of dispositions described in Para E (1)

and Para E(2). When the QCM is satisfied that the item meets all requirements, he shall sign and

date the NCR, obtain AI acceptance, remove the “Hold Tag” and r

elease the item to production.

G.

Minor repair procedure

: Clean the surface, remove hair line cracks / exposed and then watering

is done. Necessary reinforcement is done if required with wire bars. Required concrete is taken

from the mixer (same concrete used to for our precast products.) and repair is carried out. After

proper setting the QC inspector inspects and approves the repair and releases for the storage at

proper place.

PRECAST CONCRETE

Property of

DO NOT COPY