Section 9: Non-Destructive Examination and Testing
A.
All Precast Concrete Products produced at the Diamond plant require Non Destructive
Examination. Inspection and Testing shall be performed in accordance with CSA 23.2-09
standard, as applicable, and in accordance with the referenced Section : Annex 1
B.
We carry out only visual examinations and is done during the production progress by approved
QC in charge a qualified ACI level 1
C.
We have in house compression testing facility and machine is calibrated yearly. In case of
emergency we will be sending samples to the Testing Laboratory (CCIL certified lab.)
D.
Since testing technology is limited, a qualified and certified ACI Level I QC personnel shall be
appointed by letter, as required, to act on behalf of DIAMOND PRECAST CONCRETE, by the
QCM.
E.
The QCM shall retain the approved Testing Laboratory on file. The qualification and
certification records of each Lab/Test performer and Examiner will also be kept in the Testing
Lab file.
F.
All such documentation shall be made available to the Authorized Inspector (CSA). He shall
have the option to order re-qualification of procedures. He shall also have the option to order re-
qualification of personnel should he have reason to question their ability to perform properly
G.
The results of all Testing Reports will be reviewed by an Examiner. If accepted, all Testing
Reports will be reviewed by the QCM for approval. If approved, the Testing Reports are
presented to the A.I. for review and acceptance.
H.
The QCM shall make the necessary equipment available to the AI in order to enable the necessary
Slump Test; Air Entrainment Test all using calibrated instruments.
I.
Inspection is continuous ongoing during the production from raw material to the finished product
stored in yard.
J.
Once the manufacturing of Precast Concrete products has started, inspection, monitoring of
concrete mix, as well as necessary testing, is carried out. Performed tests are documented
recorded and recorded as described in Section 6.