15

DIAMOND Precast Concrete Ltd.| 7520 Conrad St | Burnaby, BC V5A 2H7

Tel: 604.415.5181 | Fax: 604.415.5185 |

www.DiamondPrecast.com

Section: 7

Date: 12/03/2015

Edition 1, Revision: 0

Page: 2 of 2

I.

The P.Eng will select all materials from the applicable CSA 23.4 (A257.4-03) Standard. The

P.Eng will list the selected constituents on the Bill of Material (Exhibit #5) with the applicable

Standard specification number, type and/or grade. The P.Eng and QCM shall review and approve

the BOM.

J.

When drawings have been approved and stamped they shall be distributed by the Q.C.M. as

follows:

1.

Copy to Production Manager

2.

Copy to Customer (or as requested)

3.

Copy to Work Order File

K.

Drawings will show all Revisions level, applicable Standard Edition, Drawing Number,

Tolerances, Concrete Strength at 28 days, Approval, Signature and Date, as well as any other

requirements deemed necessary. Any drawing without a revision level indicated is considered

revision zero.

L.

Shop Drawing is

made by design engineer and shall be marked with “released for production”. (

steel and product separately) It should be signed by Design Engineer and approved by Production

Manager.

M.

Placement of steel reinforcement, other har

dware’s like lift pins and stairs in

the form are well

described in section 3 following approved drawings.

N.

Production manager is responsible for the ensuring the correct steel drawings are submitted to the

steel suppliers along with PO and product drawing on shop floor.

O.

QC Inspector will inspect the reinforcement steel placement before pouring of concrete and

finished product dimensions from the shop drawings. (Exhibit 12)

P.

Lifting pins and step pins are reflected in drawings and forms are to be made having embedded

hardware’s. QC will is responsible to ensure they ae correctly placed before concrete pouring

(Exhibit 12)

Q.

Drawings and documents shall be transmitted using the Drawing and Document Transmittal form

(Exhibit #4.)

R.

Design Engineer is also responsible to review and audit the production of Precast Products every

two months’ time but under no circumstances will exceed three month of time to i

ssue the

Certificate of Compliance of Diamond Precast manufacturing process and products to CSA

standard A23.4 as per Exhibit # 22