DIAMOND Precast Concrete Ltd.| 7520 Conrad St | Burnaby, BC V5A 2H7
Tel: 604.415.5181 | Fax: 604.415.5185 |
www.DiamondPrecast.comSection: 7
Date: 12/03/2015
Edition 1, Revision: 0
Page: 2 of 2
I.
The P.Eng will select all materials from the applicable CSA 23.4 (A257.4-03) Standard. The
P.Eng will list the selected constituents on the Bill of Material (Exhibit #5) with the applicable
Standard specification number, type and/or grade. The P.Eng and QCM shall review and approve
the BOM.
J.
When drawings have been approved and stamped they shall be distributed by the Q.C.M. as
follows:
1.
Copy to Production Manager
2.
Copy to Customer (or as requested)
3.
Copy to Work Order File
K.
Drawings will show all Revisions level, applicable Standard Edition, Drawing Number,
Tolerances, Concrete Strength at 28 days, Approval, Signature and Date, as well as any other
requirements deemed necessary. Any drawing without a revision level indicated is considered
revision zero.
L.
Shop Drawing is
made by design engineer and shall be marked with “released for production”. (
steel and product separately) It should be signed by Design Engineer and approved by Production
Manager.
M.
Placement of steel reinforcement, other har
dware’s like lift pins and stairs in
the form are well
described in section 3 following approved drawings.
N.
Production manager is responsible for the ensuring the correct steel drawings are submitted to the
steel suppliers along with PO and product drawing on shop floor.
O.
QC Inspector will inspect the reinforcement steel placement before pouring of concrete and
finished product dimensions from the shop drawings. (Exhibit 12)
P.
Lifting pins and step pins are reflected in drawings and forms are to be made having embedded
hardware’s. QC will is responsible to ensure they ae correctly placed before concrete pouring
(Exhibit 12)
Q.
Drawings and documents shall be transmitted using the Drawing and Document Transmittal form
(Exhibit #4.)
R.
Design Engineer is also responsible to review and audit the production of Precast Products every
two months’ time but under no circumstances will exceed three month of time to i
ssue the
Certificate of Compliance of Diamond Precast manufacturing process and products to CSA
standard A23.4 as per Exhibit # 22
PRECAST CONCRETE