Section 8: Material Control

The PM and QCM are responsible for Material Control. Only materials of CSA 23.4-09 Standard will be

ordered from the Standard of Bill of Material

(

Exhibit # 5) by the PM. The PO will state that the material

is of CSA 23.4-09 Standard.

Purchase Orders of CSA 23.4-09 Standard

(

Exhibit #5) will be reviewed by the QCM prior to issuing.

Material substitution may be made only after approval by the DM. When material substitution results in

revision of drawing and/or calculations being revised, the drawing and calculation in question will be

submitted to CSA for acceptance by the authority having jurisdiction. All revised drawings and

calculations shall be submitted to the CSA for review.

The CSA 23.4-09 Standard PO for Material, including Steel, will state that

MTR’s or Certificates of

Compliance as applicable are required with supply of material.

The P.O. will be distributed as follows:

1.

Original to supplier

2.

Copy to QCM

On the Receipt of Material, the material will be checked by the QC In charge as per CSA 23.4-09

Standard Material Receiving Report (Exhibit # 7) using the appropriate measuring device, for dimension,

thickness and compliance with the P.O. and MTR. The Incoming material is also checked for any defects

or damage conditions. It is responsibility of the QCM to inspect not only the steel received but also all

necessary hardware used in manufacturing the products like lift pins, steps and necessary chains and

hooks used on the shop floor needs to have testing certificates / tags and are safe to use.

The QCM will establish a material tagging system based on material specification. The QMC will ensure

that materials are identified by appropriate tags. Accepted material is stored properly in covered place.

The QMC will also ensure that MTR’s have been supplied and that the materials conform, and are

traceable, to the MTR.

The Purchasing Manager will notify the supplier when the material is unacceptable and make

arrangements to obtain acceptable replacements.

Incorrect material will be returned to the Supplier, marked ‘Rejected’ with Tag. Such material is

Segregated and kept separately from all other production materials. The rejected material never goes to

stores or to the production floor.

The QCM will review, initial, and date each MTR for compliance with the material specification. The

MTCs are filed in the QCM office.