Previous Page  44 / 237 Next Page
Information
Show Menu
Previous Page 44 / 237 Next Page
Page Background

Page 2 of 2

1707-94 Street NW

Edmonton, Alberta

T6N- 1E6

Ph: 780-451-2111

Fax: 780-461-5322

www.csagroup.org

When CSA certifies a precast manufacturing facility to the A23.4 standard, a CSA

engineer visits the facility and conducts an onsite review and approval of the facility’s

quality system and actual production procedures. This review includes (but is not limited

to),

- Reviewing the factory’s Quality manual and work instructions;

- observing actual work processes to ensure the procedures in the quality manual are

properly implemented;

- reviewing material data sheets, mill certificates and material test records;

- reviewing equipment calibrations;

- reviewing shop drawings;

- witnessing fabrication of reinforcement cages and placement of hardware;

- witnessing concrete batching, placement, finishing, and curing;

- witnessing pre-pour and post-pour inspections conducted by the factory;

- verifying that the products are being manufactured as detailed on shop drawings;

- witnessing concrete testing and reviewing test data; and

- witnessing stripping, handling, storage and transportation operations.

Once the manufacturing facility has been certified, a CSA engineer visits the facility

regularly to conduct follow up audits to verify ongoing compliance to the CSA A23.4

standard.

CSA has the A257 standard for circular manholes, however, we do not offer a

certification program to this standard at this time.

Sincerely,

Richard A. Frederick M.Eng., P.Eng.

Certifier

CSA Group – Edmonton

Phone: 780-490-2057

Fax: 780-461-5322

E-mail:

richard.frederick@csagroup.org

PRECAST CONCRETE

Property of

DO NOT COPY