56

DIAMOND Precast Concrete Ltd.| 7520 Conrad St | Burnaby, BC V5A 2H7

Tel: 604.415.5181 | Fax: 604.415.5185 |

www.DiamondPrecast.com

Section: 15

Date: 12/03/2015

Edition 1, Revision: 0

Exhibit # 22

Certificate of Compliance

Precast products produced from Date ________________ till __________________

Precast Project # _____________________________________

Precast Project Engineer Final Inspection

Shop Drawings

Pre-pour Inspections

Post-pour Inspections

Concrete Tests

Rebar Mill Certificates

Wire Mesh Mill Certificates

Hardware Mill Certificates

Any other Misc. to review __________________

I have inspected all of the above mentioned documents and verified that all quality requirements

have been met. Based on verification of records as listed above the products were produced in

compliance with the CSA A23.4 standard.

Wang Xiao Song (Vincent),

P.Eng.

Precast Project Engineer

Date

Ramesh Nathani P.Eng.

QC / QA Manager

Date

Exhibit 22

PRECAST CONCRETE

Property of

DO NOT COPY