Canadian Standards Association

Precast concrete — Materials and construction

November 2009

21.1.2

The placing of concrete shall comply with Clause 7.2 of CSA A23.1 and

Clauses 21.1.1

to

21.4

of this

Standard.

21.2 Placing

21.2.1

The placing of concrete shall be scheduled in such a manner that each layer is placed against concrete that

has not reached its initial set.

21.2.2

The face mix and the backup mix shall be placed in such a manner that the backup mix bonds to but does

not penetrate the face mix.

Notes:

(1)

For the minimum thickness of face mix for precast concrete, see

Clause 16.3.2

.

(2)

The use of separate face and backup mixes or of a uniform concrete mix throughout the element depends on

economics, the type of finish required, the configuration of the element, and the practice of the precasting plant.

Elements with intricate shapes and deep, narrow sections generally require one uniform concrete mix throughout. See

Clause 16.3.1

.

(3)

The second mix should be placed before the evaporation of bleedwater from the first mix unless special bonding

techniques are used.

21.2.3

Concrete coating on reinforcement shall be cleaned off or the backup mix shall be placed before any

concrete on the reinforcement hardens. Alternatively, the placement of the reinforcement may follow the

consolidation of the face mix.

21.2.4

Two-stage precasting, as used for intricate elements such as column covers, corners with large returns, or

elements with abrupt changes in concrete volumes, shall be performed with construction joints that

comply with

Clause 22

.

21.2.5

In the construction of insulated concrete wall panels, the first wythe shall be carefully placed and

consolidated to the correct thickness. The concrete shall be finished with a smooth surface to minimize air

pockets between the insulation and the concrete. Any pockets showing along the edges of the insulation

shall be filled with concrete.

Notes:

(1)

The correct wythe thickness is normally accomplished or checked by a special template riding on the sides of the form.

(2)

Some sandwich wall panels are designed with an uninterrupted air space between the wythe exposed to the weather

and the insulation. This air space should remain completely open to allow water to be drained from the building.

21.3 Consolidation

Surface vibrators shall be of such a type and shape, and applied in such a manner, that suction action is

prevented during use.

Note:

See ACI 309R.

21.4 Removal of paste

Paste adhering to extended reinforcement shall be removed to ensure bonding of bars to concrete in a

later placement.

Licensed for/Autorisé à Jed Friesen Sold by/vendu par CSA on/le June/18/2015.

~Single user license only. Storage, distribution or use on network prohibited. Permis d'utilisateur simple seulement.

Le stockage, la distribution ou l'utilisation sur le réseau est interdit.